The digging be done!
-
The digging be done! I now have a gigantic upside down hole towering over the backyard.
#BackyardProject #PoolPond #diy -
Wow!
I gotta say, the plumbing/cabling or whatever it is at the edge of the construction zone is vaguely terrifying. I hope nothing was unintentionally 'discovered'.
Looks like a lot of work done, and a lot of work yet to do. Hope you get it completed before the rains begin in ernest!
-
@Amgine haha. no need to worry! Those wires were for our old shed. One was a not-code compliant beast. The other I put in for the solar panels. All power confirmed off before digging. Thankfully there were no surprises when digging. The sewer line goes off to the left in a diagonal and we had it uncovered in 2014, so we have some pictures to confirm before I dug. And yes, I did Call Before I Dig-ged. All clear. Very glad to have it done! Big job. Bit of a learning curve, but got it finished under 16 hours (about 14 I think) So they should charge me around $325 X 1.8 = $585... probably 700-800 if I'm being honest.